LIC41: Written Examination Application - NYC.gov
LIC41: Written Examination Application - NYC.gov
gaswork-qualifications - NYC.gov
Jan 1, 2020 · Pass a Department-sponsored Gas Work Qualification exam to demonstrate understanding, proficiency and competency with gas work, including: Working familiarity with the Fuel Gas Code and the ability to apply the requirements of the Code correctly; Application of skills relating to gas work on the job site
Licensing Applications & Forms - Buildings - NYC.gov
LIC41 and LIC42 applications are still being accepted, however, please expect processing delays until test sites re-open. LIC41: Written Exam Application
NYC LIC41 Exam 4 Flashcards - Quizlet
Of the following materials, which one is acceptable in a gas piping system? Plastic may only be used for gas piping __________. piping system except where they are free of __________. Gas piping must not be installed in or through a (n) __________. pressure is __________ psig or less. have __________. elbow swing. protected by __________.
Limited Gas Work Qualifications Expire 5 Years After - NYC …
Jun 20, 2024 · Schedule a Gas Work Qualification Examination by completing an LIC41: Written Examination Application form and selecting Gas Work Qualification. Accepted applicants will receive an email from the exam administrator in 2 to 3 …
High Pressure Boiler Operating Engineer - Buildings
Use this form to apply for the practical exam for the following license types: Master and Special Electrician, Master Plumber, Special Rigger, Master Rigger, Special Sign Hanger, Master Sign Hanger, High Pressure Boiler Operating Engineer, Oil …
Obtain a: Master & Special Electrician License - Buildings - NYC.gov
You must complete the exam application LIC41, check the box that indicates you are an Master or Special Electrician candidate, and submit the application with the $525.00 fee to the Department (see contact information below).
NYC LIC41 Exam 1 Flashcards - Quizlet
Study with Quizlet and memorize flashcards containing terms like Gas piping is permitted to be sized in accordance with the sizing tables of the, Using the longest length method for sizing gas piping, each section of piping is measured from __________., A newly installed 3" gas line will require purging before being placed into service if longer...
How to Obtain a: Site Safety Manager Certification - Safety …
As per the Dept. of Buildings - to obtain your Site Safety Manager Certification, you must meet the following qualifications: Candidates must also pass a written exam in order to become a Site Safety Manager. The candidate must complete the exam application (LIC41). The candidate must submit the application with a $525.00 written exam fee.
NYC LIC41 Exam 3 Flashcards - Quizlet
Study with Quizlet and memorize flashcards containing terms like A gas shut-off valve shall be located within _____ feet of the appliance., Fuel gas piping for other than dry gas conditions shall be sloped not less than _____ inch in 15 feet to prevent traps., Gas meter piping shall be pressure tested as per the _____. and more.