News

Brenmiller is set to replace Tempo's fossil fuel boilers with a 32 MWh bGen™ ZERO TES system. By enabling the switch from heat derived from fossil fuels to heat derived from electricity ...
Brenmiller's bGen™ system has already been installed in Italy with Enel - a major European utility company - as part of a pilot project to decarbonize combined heat and power ("CHP") operations.
The 32 MWh bGen™ system is expected to mitigate 6,200 tons of carbon emissions annually and save Tempo an estimated $7.5M in energy costs over 15 years ...
According to him, optimally, the storage duration should be 10 days resulting in 5-10% heat loss. The company’s test project is a 3 MWh TES system deployed at the CIEMAT institute in Spain.
ROSH HA‘AYIN, IL / ACCESS Newswire / July 8, 2025 / Brenmiller Energy Ltd. (Nasdaq:BNRG), a leading global provider of Thermal Energy Storage (“TES”) solutions for industrial and utility ...