News
A Tennessee contractor recently won a $58,000 smoothness bonus on a thin-lift hot mix asphalt (HMA) overlay by using a fine texture drum the full width of a lane on I-40 in Cheatham and Williamson ...
Hayes Road. Hayes Raod from 10 Mile Road to 11 Mile Road Service Drive in Warren. Project from 10 Mile Road to Frazho Road is HMA milling, and resurfacing, concrete pavement patching, joint repair ...
CIR begins with milling from 2 to 6 inches of existing pavement which is then processed, mixed with a recycling agent (either emulsified or foamed) and then repaved and compacted.
Project from 10 Mile Road to Frazho Road is HMA milling, and resurfacing, concrete pavement patching, joint repair, ADA sidewalk ramps, curb repair and restoration.
Work on this roadway started in the beginning of the month and the project consisted of cold milling and placing a HMA surface as well. Drivers can expect flaggers and delays during the 7 Mile ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results