News

With regard to grid codes, there are some special provisions for renewable developers to comply with Federal Energy Regulatory Commission (FERC) Order 661-A for LVRT and reactive capability ...
In accordance with these conditions, BELCO developed a draft Grid Code document for consultation. “Consultation on the Grid Code opened on September 5th, 2018 and closed September 24th, 2018.
Recently, State Grid Xinjiang Information & Communication Company has successfully completed three rounds of full-scale user ...
The initial phase of the JIP involved a high-level survey to identify the necessary standards and codes for implementing HVDC transmission systems in the U.S. The survey pinpointed four critical areas ...
Previously, the grid code-2005 had the regulation of the power transmission and dispatch system up to 500kV,” an official source privy to the meeting told Dawn.
Ehsan Nadeem Khan is working as a Grid Code Compliance Engineer based in meteocontrol’s office in Germany. His responsibilities include analysis and verification of grid code requirements.
Compliance for generators that connect to the grid is already a legal requirement in Germany, with many other countries about to follow suit. Independent testing house DNV GL has validated the Cummins ...
This story is from April 7, 2002 Power system violating grid code TNN / Apr 7, 2002, 23:50 IST AA Follow us ...