News

Sandy Springs City Council awarded a $285,439 contract to GS Construction to replace corrugated metal pipe with reinforced ...
The water wore down the soil around a 96-inch corrugated metal pipe and washed it into ... by replacing the damaged metal pipe with a reinforced concrete pipe, backfilling, then reinstalling ...
“In this case, the rotting of corrugated metal pipe installed six decades ... expected to be completed soon with some grouting on the outside of the pipe. Total cost for construction and ...