News
Still, the threat served him well. Last week in Cairo, Premier Nasser and World Bank President Black sat down to take another look at the Aswan dam project. Nasser settled for roughly half the $ ...
Dutch-based firm, Fugro, has completed a geotechnical site investigation to provide required geo-data for the design and construction of the new bridge over Egypt’s Aswan Dam on the Nile river, with ...
The Aswan governorate on Saturday 11/1/2025 marks the 65th anniversary of laying the foundation stone of the High Dam in January 1960. Aswan Governor Ismail Kamal thanked the builders of the dam, ...
On Dec. 9, 1960, construction of the Aswan High Dam began in Egypt. It would be the first time flooding on the Nile would be controlled. The first blast, delivered by President Gamal Abdel Nasser ...
The original Aswan Dam was built and completed by the British in 1902 about four miles downstream from where the Aswan High Dam is located today.
In July 1970, one of the largest dams in the world - the Aswan High Dam in Egypt - was completed. It had taken ten years to build, and was not without controversy. Louise Hidalgo brings us voices ...
The Aswan High Dam Reservoir is one of the world’s largest water reservoir and suffers from high water evaporation rates due to the region’s very hot and dry climate. Floating PV installations ...
The case in point was the Aswan Dam, which would harness the Nile, provide the parched areas of Egypt with the largest man-made reservoir in the world (and, in fact, do as much for the Egyptian ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results